McQuay air-cooled screw chiller unit, suspended air handling unit, and fresh air system, along with a DDC centralized intelligent control system.
7- Belonging to China Shipbuilding Industry Corporation Limited, it is a national research and development institution for marine diesel engines and the main supporting unit of the National Key Laboratory for Advanced Marine Engine Technology. The air conditioning system engineering project for the assembly and machining workshop of the 711 Research Institute is located on Jiangyue Road in Minhang District, Shanghai, with a total factory area of approximately 4500 square meters. The construction content includes the deepening of drawing design, equipment installation, commissioning and other services for central air conditioning, fresh air, DDC intelligent centralized control system. The project adopts McQuay air-cooled screw unit+suspended air conditioning box and fresh air system+intelligent centralized control system.















