Astronergy (Stock Code: 601877)

Toshiba full DC inverter central air-conditioning system + fresh air system + York air-conditioning terminal + intelligent centralized control system + spray humidifying system

The project is located in Wenzhou, Binhai, Zhejiang Province and Songjiang, Shanghai, with a total area of about 26,000 square meters of production plant and office building, for which our company provides services such as deepening of drawing design, equipment installation and commissioning of central air conditioning, fresh air and intelligent centralized control system. This project adopts Toshiba full DC inverter central air-conditioning system + fresh air system + York air conditioning end + intelligent centralized control system + spray humidification system.




copyright ©2023- 2025 Shanghai Heron Electromechanical Systems Engineering Co.  All Rights Reserved. Site Map