KAMAX

HVAC system, water supply and drainage system, boiler heating system, air pressure equipment, nitrogen stainless steel process piping system, water treatment system, precision air conditioning system, PLC automatic control system

     KAMAX new plant and office building project is located in Changzhou City, Jiangsu Province, with a total project area of 24,807 square meters. The construction of this project includes HVAC system, water supply and drainage system, boiler heating system, air pressure equipment, nitrogen stainless steel process piping system, water treatment system, precision air-conditioning system, PLC automation system and other projects.1.jpg

1691515901799469.jpg

1691517477866284.jpg










copyright ©2023- 2025 Shanghai Heron Electromechanical Systems Engineering Co.  All Rights Reserved. Site Map